We review remote access, shared logins and the links between office IT and plant systems. Your safety and operations teams set the pace, and we start passively.
- Level 4Office ITEmailERPReports
- Level 3Plant DMZJump hostHistorian copyHistorian link
- Level 2OperationsHistorianEngineering PCRemote desktop
- Level 1ControlPLCsHMIsVendor VPN
- Level 0Safety systemsSafety controller
Safety sets the pace.
A plant isn't an office. We work around your process, your people and your maintenance plan.
We watch first.
We map systems from configurations and traffic copies. Nothing is scanned without written approval.
Your team can stop us.
Safety and operations leads set the method, the window and when to stop.
Changes fit your plan.
Each change has an owner, an approved window and a tested way back.
Every way into the plant, on one register.
Vendor tunnels, remote desktops and forgotten links. For each one, we agree with you whether to keep it, narrow it or remove it.
- Used by
- Vendor support, a few times a year
- Today
- Always on, one shared account
- Narrow
- Open on request only, recorded, and limited to one HMI.
- When
- Next maintenance window, with a tested way back
How a site review runs.
Passive first. Changes only in a window you approve.
We start by listening.
We read configurations and copies of network traffic, and we talk to your engineers. Nothing is sent to the control network without approval.
Changes go in during a window.
We plan each change into your maintenance schedule, with an owner and a rollback your team has tested.
- Vendor VPN on request onlyOT lead
- Remote desktop via jump hostSite IT
- Modem disconnectedSite lead
A safer site, in practice.
We scope each review with your site team. Here's what you keep at the end.
A site access map
Your zones, what connects them and every remote route into them.
An approved change plan
Each change with its owner, its window and its rollback steps.
Procedures that work
Access, response and recovery steps, practised with your operators.
Passive discovery is the default. Active testing or changes need written approval, site controls and a rollback plan.
Three ways to bring us in.
Book a single review, add a site to Enterprise Security, or refer a public service.
Scoped with your site team
One site review
Passive mapping, the access register and an approved change plan. We confirm the fee in writing before we start.
Plan a site reviewFrom $25,000 USD / year
Enterprise Security
Add an industrial site to your 12-month programme as an extension, scoped with your site and safety teams.
See Enterprise SecurityFree · $0
Public Infrastructure Security
Free for public services across Africa. We safely observe what's exposed online and report privately to the owner.
See Public Infrastructure Security
Common questions.
Will you scan our control network?
Not without written approval. We start passively, from configurations, traffic copies and conversations with your engineers.
Who decides when to stop?
Your safety and operations leads. They set the method, the window and the stop conditions.
Do you only look at OT?
No. Most risk sits where office systems meet the plant, so we look at both sides of that link.
Can you work with our vendors?
Yes. We map each vendor's access with them, keep what they need and agree how it's used.
Start with the site's limits.
Bring operations and safety to the first call. We'll plan the review around the process.